January 2012 – Open for Business

This slideshow requires JavaScript.

Posted in Uncategorized | Leave a comment

December 10 – Ten Days Till the Move

This slideshow requires JavaScript.

Posted in Uncategorized | Leave a comment

November 23 – Trim, Doors and Furniture

Many final finishes are being installed at the same time right now.
The “move-in” date is December 20.

This slideshow requires JavaScript.


The interior doors and trim are labor intensive and will be worked on up till the final week of construction. Cabinets and counter tops are being installed and finished. Plumbing fixtures are being hooked up to the roughed in plumbing. Heating and cooling unit controls are being wired and the refrigerant systems pressure tested. Control systems for fire protection, intrusion alarms, building access and lighting are being installed and tested. Floor coverings are being installed. Workstations and office furniture is being assembled and wired for power and data. Meanwhile the generous rain and warm temperatures are perfect for the grass seeding and other landscaping plantings.

Posted in Uncategorized | Leave a comment

October 29 – Lots of Finishes In Progress

This slideshow requires JavaScript.

Posted in Uncategorized | Leave a comment

September 2 – Ceiling Grid

Ceiling grid is installed using a laser to strike a line around the room.


Garden Level ceiling grid is completed.


Ceiling Grid and lights are installed in conference rooms.

Posted in Uncategorized | Leave a comment

August 22 – Preparing the Drive for Paving

This slideshow requires JavaScript.

Posted in Uncategorized | Leave a comment

August 18 – Light Poles

This slideshow requires JavaScript.

Posted in Uncategorized | Leave a comment

August 11 – Moving the Job Site Trailers

The contractor’s storage and office trailers have been on site for a year, and now they need to move to make way for parking lot construction. At the same time, AMBS is beginning their chapel renovation project using the same general contractor. Moving the trailers next to the AMBS chapel parking lot gets them out of the way for paving and landscaping, keeps them near the job site, and allows them to be used for the chapel project at the same time.

This slideshow requires JavaScript.

Posted in Uncategorized | Leave a comment

August 11 – Light Shaft

Light shafts between the street level and garden level connect the spaces and allow natural light into the garden level from the skylights above.

Looking up through light shaft to the skylight



Posted in Uncategorized | Leave a comment

August 8 – Concrete Work


Rear courtyard area from northwest

Posted in Uncategorized | Leave a comment